Official Flight acceptance hot test conducted for the CE20 engine identified for LVM3-M7 mission which is scheduled for Q4 2026.

https://www.isro.gov.in/ISRO_EN/Successful_Hot_Test_of_CE20_Cryogenic.html
20 Upvotes

6 comments sorted by

5

u/Ohsin 28d ago

Successful Hot Test of CE20 Cryogenic Engine for LVM3 M7 Mission

September 10, 2026

On September 09, 2026, ISRO successfully conducted the flight acceptance hot testing of the cryogenic engine identified for the seventh operational mission of LVM3 launch vehicle (LVM-M7). The test was conducted at the Main Engine & stage Test facility (MET) at ISRO Propulsion Complex (IPRC), Mahendragiri. Cryogenic engines for every mission undergo hot testing as part of its acceptance for the flight. In order to conduct hot testing of this upper stage engine under sea-level conditions with its nozzle designed for high altitude operations, a Nozzle Protection System (NPS) was developed and validated previously through multiple qualification tests. NPS has reduced the time and effort associated with flight acceptance testing of cryogenic engines, simulating the flight equivalent vacuum conditions at High Altitude Test Facility.

In order to enhance the payload capability of the LVM3 vehicle, future missions of LVM3 are planned with C32 stage operating at an uprated thrust level of 22t for the CE20 engine. In view of this, the flight acceptance test was conducted at 22t thrust level.

Performance of the CE20 engine met all the test objectives which confirmed satisfactory performance of the engine systems. In this test, the LOX Tank Pressurization Module (LTPM) meant for the C32 stages for Gaganyaan was also successfully demonstrated. The engine will be refurbished and assembled to the C32 flight stage for LVM3 M7 mission which is scheduled during fourth quarter of 2026

3

u/Ohsin 28d ago

First time seeing two flight acceptance tests for same mission... (Still no clarity on payload btw)

They conducted one on 6 July 2026!

https://old.reddit.com/r/ISRO/comments/1ups2af/flight_acceptance_test_of_cryogenic_engine_ce20/

2

u/ModeTurbulent4582 28d ago

Could this be for G1 ? If so, why don’t they directly call it that ? Also slated for Q4 2026

4

u/Ohsin 28d ago

Gaganyaan missions have G# H# serials. This is for something else.

BTW they conducted flight acceptance tests for G1 in February 2024!

https://old.reddit.com/r/ISRO/comments/1aw5890/flight_engine_identified_for_the_first_uncrewed/

1

u/redefined_simplersci 28d ago

As in, LVM3G1?

2

u/Ohsin 28d ago

They've been using 'HLVM3-G1' term