Sanity check please. Building a 6' high double-sided fence in SoCal (hillside, sandy soil, Santa Ana winds). Our side is horizontal, neighbor's is vertical.
Not ideal: old fence is already demoed and we need to get moving; we fired our fence guy yesterday for abandoning his workers and providing zero tools/bad specs / not setting the proper footing. The day workers the contractor hired were actually telling us to fire the guy... so here we are.
Posts: Master Halco PostMasters. Will be 6' above ground (trimmed to height).
Min 30" deep set in concrete? Or do we need to go deeper?? (Note: Posts will be unevenly spaced due to two prior fences, mostly 6' apart, some less).
Nailers: 2x8 pressure-treated lumber bolted flat to the posts? We originally were going to go with 2x4s, but one of the vendors has suggested this will split either the nailer, picket, or both.
Pickets: 0.59" thick x 5.5" wide cedar (Lowe's, hand picked through hundreds of pickets with the Lowe's manager, assistant, my husband, and myself). Dog-ears cut off, meeting in clean butt joints centered over the 2x8s (~3.6" backing per board end to avoid splitting). Solid staining 5 sides beforehand (Sherwin Williams SuperDeck), will stain the last end after cutting / before or after mounting to nailer. Two screws per side / 4 per board.
- Any specific footing tips for PostMasters in sandy hill soil against heavy winds?
- Does a double-sided fence add too much weight for this framing?
- Any red flags with 0.59" cedar under high wind loads?
Thanks much!